Lynah renovations - completion pool
Posted by billhoward
Lynah renovations - completion pool
Posted by: billhoward (---.hsd1.nj.comcast.net)
Date: March 13, 2006 02:46PM
Once you've filled in your Road to Indianapolis bracket for the office or dorm pool, how about a pool for Lynah completion? Pick either a date or some other measureable milestone. For instance, these would all be valid possibilities:
[] 11/1/2005
or
[] 45 days after the completion date declared during reunion weekend by the AD
or
[] first 3 home games have to be reshuffled
or
[] 11/1/2005 but only for 3100 people ... wearing respirators
or
[] Indefinitely ... site declared to be sacred Native American burial ground [actual cause: circa 1970 Lynah faithful set upon previous Dartmouth mascot, stole buckskin pants and headdress and stuffed them behind bushes which became overgrown until backhoe work this week. Resolution being worked out to tithe remains to Mohegan Sun in exchange for future naming rights.]
or
...
[] 11/1/2005
or
[] 45 days after the completion date declared during reunion weekend by the AD
or
[] first 3 home games have to be reshuffled
or
[] 11/1/2005 but only for 3100 people ... wearing respirators
or
[] Indefinitely ... site declared to be sacred Native American burial ground [actual cause: circa 1970 Lynah faithful set upon previous Dartmouth mascot, stole buckskin pants and headdress and stuffed them behind bushes which became overgrown until backhoe work this week. Resolution being worked out to tithe remains to Mohegan Sun in exchange for future naming rights.]
or
...
Re: Lynah renovations - completion pool
Posted by: Trotsky (---.raytheon.com)
Date: March 13, 2006 02:47PM
First home game after Estero.
(In retrospect, that could be interpreted as self-fulfilling, so: first *scheduled* home game after Estero.)
(In retrospect, that could be interpreted as self-fulfilling, so: first *scheduled* home game after Estero.)
Edited 1 time(s). Last edit at 03/13/2006 02:48PM by Trotsky.
Re: Lynah renovations - completion pool
Posted by: Jordan 04 (12.42.45.---)
Date: March 13, 2006 02:49PM
I thought the title meant a pool for how many Lynah Renovations threads Bill can start in one day
Re: Lynah renovations - completion pool
Posted by: billhoward (---.union01.nj.comcast.net)
Date: March 13, 2006 02:50PM
(Guilty! Just posted a private message to another active poster saying, "I see a couple of us are having trouble concentrating on work today.)
Re: Lynah renovations - completion pool
Posted by: Jordan 04 (12.42.45.---)
Date: March 13, 2006 02:52PM
billhoward
(Guilty! Just posted a private message to another active poster saying, "I see a couple of us are having trouble concentrating on work today.)
Hmm...maybe I should check my PM's
Re: Lynah renovations - completion pool
Posted by: andyw2100 (---.twcny.res.rr.com)
Date: March 13, 2006 02:53PM
I'll go out on a limb.
In time for the first scheduled home game.
(Who says I'm not an optomist?)
Andy W.
In time for the first scheduled home game.
(Who says I'm not an optomist?)
Andy W.
Re: Lynah renovations - completion pool
Posted by: Give My Regards (---.oracorp.com)
Date: March 13, 2006 05:26PM
I'll go out on a limb too.
The Big Red will spend the entire 2006-07 season at whatever its alternate home site will be. Renovations will be finished in time for the first scheduled home game of 2007-08, not before.
I prefer to consider myself a "realist".
The Big Red will spend the entire 2006-07 season at whatever its alternate home site will be. Renovations will be finished in time for the first scheduled home game of 2007-08, not before.
I prefer to consider myself a "realist".
___________________________
If you lead a good life, go to Sunday school and church, and say your prayers every night, when you die, you'll go to LYNAH!
If you lead a good life, go to Sunday school and church, and say your prayers every night, when you die, you'll go to LYNAH!
Re: Lynah renovations - completion pool
Posted by: jy3 (---.buff.east.verizon.net)
Date: March 13, 2006 07:20PM
no home games until after the new year is my guess
___________________________
LGR!!!!!!!!!!
jy3 '00
LGR!!!!!!!!!!
jy3 '00
Re: Lynah renovations - completion pool
Posted by: billhoward (---.hsd1.nj.comcast.net)
Date: March 13, 2006 08:43PM
The responses restore my faith that Cornellians across multiple decades share a common skepticism about things getting done on time.
Re: Lynah renovations - completion pool
Posted by: Robb (68.171.152.---)
Date: March 13, 2006 09:53PM
Wha?? Did they contract this out to a Lockheed/Boeing team or something???fenwick
I'll go out on a limb too.
The Big Red will spend the entire 2006-07 season at whatever its alternate home site will be. Renovations will be finished in time for the first scheduled home game of 2007-08, not before.
I prefer to consider myself a "realist".
Re: Lynah renovations - completion pool
Posted by: WillR (205.232.75.---)
Date: March 14, 2006 12:33AM
i have equal faith in the construction getting finished on budget or on time. Though with any luck perhaps Schafer can "yell the right stuff" to move things along.
-WillR
-WillR
Re: Lynah renovations - completion pool
Posted by: billhoward (---.ziffdavis.com)
Date: March 14, 2006 10:32AM
I was leafing through a year-old charter-jet magazine (I forget why I was killing time, but the date of the magazine kind of says it all) and there was a story about a guy who runs a fleet of FalconJets because he builds 500-room luxury resorts from scratch in six months. In developing parts of Asia where perhaps building inspectors are more malleable.
So doing this over the summer seems feasable. Cornell just needs the rink buttoned up by fall. Actually, it needs to be skateable again by summer if the annual hockey school is being run. I don't recall if the existing locker rooms were being demolished or if that's a phase II or parallel phase.
Just hope there's no snail darter lurking in a Lynah storm drain. Then there'd be two lines outside Lynah -- one for tickets, one for the alleged improvement of the environment.
So doing this over the summer seems feasable. Cornell just needs the rink buttoned up by fall. Actually, it needs to be skateable again by summer if the annual hockey school is being run. I don't recall if the existing locker rooms were being demolished or if that's a phase II or parallel phase.
Just hope there's no snail darter lurking in a Lynah storm drain. Then there'd be two lines outside Lynah -- one for tickets, one for the alleged improvement of the environment.
Re: Lynah renovations - completion pool
Posted by: Trotsky (---.raytheon.com)
Date: March 14, 2006 11:13AM
Robb
Wha?? Did they contract this out to a Lockheed/Boeing team or something???
That depends. Did the bid exceed the university endowment?
Edited 1 time(s). Last edit at 03/14/2006 11:58AM by Trotsky.
Re: Lynah renovations - completion pool
Posted by: KeithK (---.external.lmco.com)
Date: March 14, 2006 11:43AM
No. We sometimes bid low. But only if it's cost plus. We demand the endowment later, when the unexpected cost overruns appear. Oh, and the 2007 prediction? That's OK for now, but we'll take a two year slip due to requirements redefinition over the summer...TrotskyRobbWha?? Did they contract this out to a Lockheed/Boeing team or something???fenwick
I prefer to consider myself a "realist".
That depends. Did the bid exceed the university endowment?
Re: Lynah renovations - completion pool
Posted by: Trotsky (---.raytheon.com)
Date: March 14, 2006 12:01PM
KeithKNo. We sometimes bid low. But only if it's cost plus. We demand the endowment later, when the unexpected cost overruns appear. Oh, and the 2007 prediction? That's OK for now, but we'll take a two year slip due to requirements redefinition over the summer...TrotskyRobbWha?? Did they contract this out to a Lockheed/Boeing team or something???fenwick
I prefer to consider myself a "realist".
That depends. Did the bid exceed the university endowment?
We don't even need to bid. We've already secured an SSJ. Raytheon's the only prime who can install a BGM-109 Tomahawk delivery system at the red line to intercept odd man rushes.
Re: Lynah renovations - completion pool
Posted by: jy3 (---.buff.east.verizon.net)
Date: March 14, 2006 06:01PM
Trotsky
Raytheon's the only prime who can install a BGM-109 Tomahawk delivery system at the red line to intercept odd man rushes.
___________________________
LGR!!!!!!!!!!
jy3 '00
LGR!!!!!!!!!!
jy3 '00
Re: Lynah renovations - completion pool
Posted by: David Harding (---.dsl.emhril.ameritech.net)
Date: March 14, 2006 07:32PM
They are taking registrations for the hockey camps. [www.athletics.cornell.edu]billhoward
So doing this over the summer seems feasable. Cornell just needs the rink buttoned up by fall. Actually, it needs to be skateable again by summer if the annual hockey school is being run. I don't recall if the existing locker rooms were being demolished or if that's a phase II or parallel phase.
Re: Lynah renovations - completion pool
Posted by: Will (---.cable.mindspring.com)
Date: March 14, 2006 10:23PM
Towards the bottom of the page, it reads, "On ice sessions for 2006 will take place at "The Rink" near Cornell, due to the expansion project at Lynah."David HardingThey are taking registrations for the hockey camps. [www.athletics.cornell.edu]billhoward
So doing this over the summer seems feasable. Cornell just needs the rink buttoned up by fall. Actually, it needs to be skateable again by summer if the annual hockey school is being run. I don't recall if the existing locker rooms were being demolished or if that's a phase II or parallel phase.
___________________________
Is next year here yet?
Is next year here yet?
Re: Lynah renovations - completion pool
Posted by: David Harding (---.dsl.emhril.ameritech.net)
Date: March 14, 2006 10:38PM
That makes a lot more sense. I stopped scanning when I got to the coaches bios.